Assessments
Quiz — Transform prototype into final publication
Check your understanding. Answer each question and press Check for instant feedback. There is no grade — retry as many times as you like.
During a user trial, three participants become trapped behind a lift in Level 2 and cannot continue without restarting the game. Which action best treats this finding as a required publication-stage change?
A disciplined change request for a playtest issue should link the issue to , state the result from the specification or intended design, define criteria for QA, and send the fix for testing before closure.
A user-trial defect can be marked closed as soon as its status is changed to 'Ready for test'.
Match each late-stage issue status to its most appropriate meaning.
A team is preparing to integrate final 3-D game elements into the release build. Which checks should be included in the integration checklist? Select all that apply.
Select all that apply.
Match each game asset or engine item to a typical format or representation used during integration.
A final build contains the 3-D model for a locked door, but players receive no prompt, no sound, no inventory check and no fallback message when they lack the key. What is the best assessment of this element?
A feature-complete build must have every required system present so QA can test the product as a whole, but it may still contain bugs that need fixing.
Match each final QA activity to the check it mainly performs.
A release candidate must be checked against the approved navigation design. Which checks provide evidence that implemented sequences conform? Select all that apply.
Select all that apply.
To check a gameplay sequence, start from a , follow the , then test and confirm from failure states.
A final check report shows that all required menu paths work, but one unresolved defect sometimes prevents players from progressing after a checkpoint reload. What recommendation is most appropriate?
Before asking required personnel to approve a release candidate, which items should be prepared as part of the sign-off evidence pack? Select all that apply.
Select all that apply.
During final sign-off, a senior reviewer suggests adding a new multiplayer mode that was not in the approved specification. What is the best release-management response?
Your team freezes a specific versioned build that could become the final publication if the required reviewers approve it. Enter the standard two-word term for this build.
An organisational procedure requires the final archive allocation to include the approved packaged build, the source snapshot and the evidence pack, plus 10% contingency. The packaged build is 2.8 GB, the source snapshot is 1.6 GB and the evidence pack is 0.35 GB. What minimum storage allocation, in GB, should be planned?
A game that works correctly in the engine editor should still be launched and smoke-tested as a packaged build before distribution.
A team has final sign-off for a WebGL build. What should they do immediately after uploading it to the approved portal?
Match each publication item to its purpose.
A safe release workflow is to confirm , obtain , upload through an , and archive the .